image-7 Steps for CNC Machines Monthly Maintenance

7 Steps for CNC Machines Monthly Maintenance


04 Jun, 24
                        

7 Steps for Monthly Maintenance of CNC Machines

  1. Clean the coolant tank and filters, and replace the coolant if required.
  2. Clean the electrical panel for dust and check all connections.
  3. Check electrical/oil hoses for cracks and replace them if required.
  4. Dismantle the chuck and drawbar and re-grease after cleaning.
  5. Clean spindle belt, replace if required. Clean spindle cooling fan.
  6. Check the 3-phase supply from the stabilizer, and adjust if required 415 volts.
  7. Check earth-neutral voltage <3 volts.